Temporary Steel Support Structure for Bridge Construction
Country: Canada
Project Scale: 1,850 m²
Steel Tonnage: 1,240 tons
Completion Time: August 2025
A bridge construction project needed temporary steel supports during girder installation. The structure had to support heavy loads during construction and be dismantled after completion.
We designed a temporary steel shoring system with strong vertical columns, horizontal bracing, and adjustable height components. The system was prefabricated, marked, and shipped for quick assembly.
Key Highlights:
- Temporary bridge shoring system
- Adjustable height components
- Strong vertical load capacity
- Easy assembly and dismantling design
Ideal For: Bridge construction supports, temporary shoring, heavy load temporary works, and infrastructure erection projects.